Key takeaways
- → Croydon’s revised additional and selective commencement date is 25 September 2026.
- → Selective licensing covers 14 wards; the additional scheme is borough-wide.
- → The March 2026 temporary accommodation snapshot does not promise a property offer.
- → Supply the actual address, use, licence and unit details before comparing a lease.
A Croydon home, HMO or block needs its own proposal
For guaranteed rent, a Croydon landlord leases the agreed premises to a vetted organisation for 3 years or more. The Croydon borough page brings the local evidence together; the Croydon HMO page separates the shared-home checks.
Rent is paid as set out in the signed agreement, including when the property is empty, unless the contract says otherwise. Matching is with vetted guaranteed rent providers, not automatically Croydon Council. Councils or housing associations can be leaseholders where they take a lease; confirm the named organisation in the signed agreement.
What the dated Croydon housing figures measure
MHCLG's Statutory homelessness, Detailed local authority level tables: January to March 2026, Table TA1 records 3,241 households in temporary accommodation arranged by Croydon on 31 March 2026, including 2,323 households with children and 4,613 children in temporary accommodation. The latest quarter is provisional. These are placements arranged by that council wherever the accommodation is, including out-of-area placements, not neighbourhood demand or a promise of an offer.
Alongside Croydon's council-arranged snapshot, Table TA1 records 76,020 households across London and 135,580 across England on 31 March 2026. The latest quarter is provisional and includes out-of-area placements. These are context for the borough, not a rent valuation or a commitment to lease a property.
Source: MHCLG live tables, Table TA1. Household totals, households with children and children are different measures, not figures to add together. A landlord still needs a property-specific assessment rather than an offer inferred from the council total.
Use the amended commencement, not the earlier date
Croydon amended the commencement of both its additional and selective schemes from 1 September 2026 to 25 September 2026; the designated area was otherwise unchanged.
Additional HMO licensing applies borough-wide from 25 September 2026 to smaller HMOs not covered by mandatory licensing, occupied by 3 or 4 persons comprising 2 or more households.
Selective licensing applies from 25 September 2026 in 14 wards only: Addiscombe East; Addiscombe West; Bensham Manor; Broad Green; Fairfield; Norbury and Pollards Hill; Norbury Park; Selhurst; South Croydon; South Norwood; Thornton Heath; Waddon; West Thornton; Woodside. It covers a single household, a single tenant or two individuals sharing, unless already licensed under mandatory or additional HMO schemes. Check the actual address with the council.
Read the Croydon commencement amendment, additional scheme and selective scheme for the address and intended use. No fee or unsupported end date is listed here.
Thornton Heath, South Norwood and Norbury are address checks
Thornton Heath, South Norwood and Norbury have existing neighbourhood guides. Use them to describe the property, but establish the actual selective ward with the council. A place name is not proof of a ward boundary or a licensing exemption.
The South London hub and London pillar connect the wider guides. Lambeth, Bromley, Sutton, Merton and Lewisham need their own council checks. Do not import Croydon’s schemes into those boroughs.
Describe the home rather than just the bedroom total
For a house or flat, show the room layout, condition, actual occupancy and existing agreements. For an HMO, distinguish people and households from bedrooms and show shared amenities and licence information. For several flats or a block, list included units and explain common parts and agreed responsibilities.
The general HMO guide, block guide and London block and portfolio guide provide background. An existing licence does not itself approve a changed use or establish provider suitability.
Settle the lease and legal position in writing
Confirm the leaseholder, rent payment clause, reviews, term, break clauses, maintenance, inspection access and hand-back condition. Joining is free with no obligation and there are no management fees on guaranteed rent. Providers and councils place and support occupiers; Social Ready does not do so itself.
The Renters' Rights Act applies in England. A genuine lease to an organisation is not an assured tenancy, but occupiers' own agreements may still be protected. This is general information, not legal advice: take independent legal advice before you sign.
Read the London rent reform guide and obtain independent advice on existing tenancies and the proposed lease. The aim can be to reduce risk, admin and uncertainty, not to avoid the law.
Submit the actual Croydon property
Send the property details, including the full address, asking rent, condition, availability, room plan and licence details. Explain current occupancies, outstanding works and shared-building arrangements. You can contact hello@social-ready.co.uk. The website is not a binding offer.
The London guide, Newham guide and Brent guide offer comparisons of local context. They do not turn any borough total into a property offer or a timescale.
NoteGeneral information, not legal advice. Every agreement is set out in your Rent Guarantee Agreement — take independent legal advice on your situation.
FAQ
25 September 2026 for both the additional and selective schemes. The council amendment changed the earlier 1 September date without changing the designated area.
Yes, for smaller HMOs not covered by mandatory licensing, occupied by 3 or 4 persons comprising 2 or more households. Check the actual building and any exemptions.
No. It covers the 14 listed wards and stated single-household or sharing arrangements, unless already licensed under mandatory or additional HMO schemes. Check the address with the council.
No. Matching is with vetted guaranteed rent providers. The organisation named in the signed agreement is the leaseholder.
No. The Table TA1 snapshot is dated 31 March 2026 and includes council-arranged out-of-area accommodation. The latest quarter is provisional and does not establish neighbourhood demand.
3 years or more. The signed agreement sets rent, responsibilities, reviews and any break clauses.
Sources

About Social Ready
Social Ready Ltd is an award-winning social housing brokerage (Social Value Award, National Property Awards 2026) based at 96b Queen's Rd, Watford, with over 20 years of combined experience across property and social housing. More about us →
