Key takeaways
- → Phase 1 took effect across England on 1 May 2026, including London; there is no separate London commencement.
- → The registration service starts in the West Midlands on 15 December 2026. London's registration period runs from 15 July 2027 to 14 October 2027 (before midnight).
- → Borough licensing remains a separate address-specific check.
- → A provider lease needs independent review and does not remove occupiers’ rights.
An England-wide Act, a London property checklist
London landlords face the same national phase 1 reforms as other private landlords in England. The practical London question is how those reforms sit alongside the council, building and agreement for each address. Our London guide is the starting point for that local context.
Read the national Act guide and Section 21 options for the broader discussion. This article focuses on organising London checks, not reproducing those guides or advising on a particular tenancy.
What changed on 1 May 2026
The official implementation roadmap says phase 1 came into force on 1 May 2026 for new and existing private rented tenancies in England. It includes London; there is no London-only start date.
- Abolition of section 21, Assured Periodic Tenancies in the private rented sector and reformed possession grounds.
- Rent increases limited to once a year through the revised section 13 procedure, with at least 2 months’ notice.
- A ban on rental bidding and on requesting more than 1 month’s rent in advance.
- A ban on discriminating against renters who have children or receive benefits.
- A duty to consider tenant requests to rent with a pet: 28 days to consider, with valid reasons if refused.
- Stronger council enforcement and rent repayment orders.
Review the tenancy and the information already supplied
The tenant overview for England explains that many existing assured shorthold tenancies automatically became assured periodic tenancies on 1 May 2026. Tenants can end a tenancy by giving two months’ notice. Different rules apply to housing association or council renting and student halls.
The official Information Sheet was due to be given to tenants by landlords and letting agents covered by that requirement by 31 May 2026. That deadline is already past. Check whether your tenancy was covered and obtain advice if your records are incomplete; do not treat a new service arrangement as correcting earlier omissions.
London's registration period is now confirmed
The government announcement, published on 9 September 2026, says the PRS registration service launches on 15 December 2026, starting in the West Midlands and then rolling out region by region. The official guidance for landlords, checked on 16 November 2026, confirms that each region has a three-month registration period and that occupied properties in each region must be registered by that region's end date.
The guidance's table of region registration periods lists London with a start date of 15 July 2027 and an end date of 14 October 2027 (before midnight). Landlords may register before their region's start date. During the rollout, from 15 December 2026 to 14 November 2027, you only have to register properties that are currently under let, or which become let during this period. The landlord registration guide provides separate background.
The roadmap also places a Landlord Ombudsman in phase 2. Phase 3 covers Awaab’s Law and a Decent Homes Standard for the private rented sector, with timescales subject to consultation. This guide does not assign dates to those measures.
Keep borough licensing beside the national checklist
For a London portfolio, record the tenancy type and the actual council for each address. Review Brent, Newham, Westminster, Hackney and Croydon through their existing borough guides and council sources. National tenancy reform is not a London-wide licensing scheme.
Browse North London, South London, East London and West London as informal groupings, not licensing authorities. The Newham guide and Brent guide explain why district names and ward boundaries need separate checks.
London housing evidence is context, not an offer
MHCLG Table TA1, Detailed local authority tables January to March 2026, records 76,020 households in temporary accommodation arranged by London councils on 31 March 2026, of 135,580 in England. The latest quarter is provisional. Council-arranged accommodation includes out-of-area placements. These figures do not establish neighbourhood demand or promise an offer for your property.
Review the actual landlord–provider relationship
With guaranteed rent, Social Ready introduces landlords to vetted guaranteed rent providers for leases of 3 years or more. A provider lease is not automatically a council lease. Rent is paid as set out in the signed agreement, including when the property is empty, unless the contract says otherwise.
The Renters' Rights Act applies in England. A genuine lease to an organisation is not an assured tenancy, but occupiers' own agreements may still be protected. This is general information, not legal advice: take independent legal advice before you sign.
Review existing tenancy commitments, who will sign and the proposed occupier arrangements with an independent adviser. If you want to put a London property forward, submit the property details. You can also contact hello@social-ready.co.uk. The website is not a binding offer.
NoteGeneral information, not legal advice. Every agreement is set out in your Rent Guarantee Agreement — take independent legal advice on your situation.
FAQ
No. Phase 1 took effect in England on 1 May 2026, including London, for new and existing private rented tenancies.
The roadmap says once a year through the revised section 13 procedure, with at least 2 months’ notice. Check current guidance and take advice on your tenancy.
London's registration period runs from 15 July 2027 to 14 October 2027 (before midnight), according to the official guidance's table of region registration periods. The service starts in the West Midlands on 15 December 2026, and each region has a three-month registration period. Landlords may register before their region's start date.
Each region has its own end date, and occupied properties must be registered by that region's end date. London's end date is 14 October 2027 (before midnight). During the rollout, only properties that are under let, or which become let during the period, have to be registered.
No. A genuine organisation lease is not an assured tenancy between landlord and provider, but occupiers’ own agreements may still be protected. Take independent legal advice.
No. Check the council for the actual address, building and intended occupancy. London sub-region hubs are not licensing authorities.
Sources
- GOV.UK: Renters’ Rights Act implementation roadmap
- GOV.UK: overview for tenants in England
- GOV.UK: Information Sheet 2026
- GOV.UK: registration announcement, published 9 September 2026; checked 13 November 2026
- GOV.UK: Register your rental property service: guidance for landlords
- MHCLG: Table TA1, 31 March 2026; latest quarter provisional

About Social Ready
Social Ready Ltd is an award-winning social housing brokerage (Social Value Award, National Property Awards 2026) based at 96b Queen's Rd, Watford, with over 20 years of combined experience across property and social housing. More about us →
